Home / Guide
GUIDE TO CONCRETE PUMPING

What to expect on pour day.

A plain-language walkthrough of how a boom pump job runs, from the first call to clean-out.

THE PROCESS

Four steps, start to finish.

STEP 01

Request a Quote

Send us the site address, the type of pour, and the date. We give you a straight price based on the job.

STEP 02

Site Check

We confirm access, truck placement, and boom reach against the site, trees, wires, and tight lots all factor in here.

STEP 03

Confirm & Schedule

Once the setup is confirmed, we lock in the date and coordinate timing with your ready-mix delivery.

STEP 04

Pour & Wash-out

The crew places the concrete where you need it. We bring our own water for wash-out, so there's nothing extra required from your site.

BOOM PUMPS, EXPLAINED

Why a boom over a direct chute or wheelbarrows.

A boom pump moves concrete through a hose carried on a hydraulic arm, placing it precisely at height or distance without hand-carrying it across the site. For foundations, elevated slabs, and sites the mixer truck can't reach directly, it's the difference between a controlled pour and a scramble.

Because the boom is remote-controlled, the operator can position the hose exactly over the forms, useful on multi-story pours, tight lots, and jobs where minimizing labor on the ground matters.

Boom pump hose placing concrete directly into wall formwork

Site Access

The truck needs a clear, level spot to set up its outriggers, usually 20–25 ft of clearance. We confirm this against your site before pour day.

Mix Considerations

Aggregate size and slump affect how smoothly concrete moves through the pipeline. Let us know your mix design when requesting a quote so we can plan accordingly.

Wash-out

We carry our own water on the truck for cleaning the pump and pipeline after the pour, so there's no draw on your site's water supply.

Questions about your specific site?

Reach out and we'll walk through the setup with you directly.

Request a Quote